HARBOR TECHSOLUTIONSPort & terminal technology
000%
Loading the portGate · Yard · Quay · Rail · Road
Quay cranes along the waterfront of a container terminal

Industries · 01 / 04

Every move on the quay,visible before it happens.

Terminal operating systems, berth and yard optimisation, gate automation and security, built for the way your terminal actually runs.

Discuss a ports project →
Vessel · Yard · Gate · Rail01 / 03
Quay · Gate02 / 03
Perimeter03 / 03

Terminals lose moneyin the gaps between systems.

Gap 01

Fragmented operational picture

Vessel, yard, gate and rail data live in separate tools, so planners reconcile by phone and spreadsheet.

Planners reconcile by phone and spreadsheet

Fragmented operational picture

Idle assets, long queues

Security as an afterthought

What we build for ports.

01 / 04

Berth & Yard Optimisation

Constraint-based planning that turns arrival windows into executable schedules.

  1. Constraint-based planning that turns arrival windows into executable schedules.

YardBerthGatePerimeterTOS

01 / 04 built

Typical resultsacross our deployments.

  1. 0%

    faster truck turnaround

  2. 0%

    more crane moves per hour

In practiceGateway container terminal600,000 TEU

A gateway container terminal replaces three disconnected tools

A 600,000 TEU terminal runs planning, gate and security on separate systems. HarborTech scopes a single TOS with integrated gate appointments and perimeter monitoring, delivered in phases so operations never stop.

Gateway container terminal

Gateway container terminal

600,000 TEU

Before. Planning, gate and security on separate systems.

A single TOSOne system of record
Planning

Planning

Gate

Gate

Security

Security

Delivered in phases so operations never stop0 / 3 live
  1. Phase 1

    Single TOS

  2. Phase 2

    Integrated gate appointments

  3. Phase 3

    Perimeter monitoring

Next industry · 02 / 04

Cargo terminals, apron operations and landside security.

AirportsAirportsAirportsAirportsAirportsAirports

Ready to connect your port?

Start with a live gate pilot within 90 days of agreement.